2015年10月11日星期日

Rocky ridge or cliff by bulldozer

When the Hydrostatic dozer required by larger land package or cliff Hom and other obstacles should slowly and diverted. When you reach the apex body will be tilted forward at the moment, should be promptly separated from the clutch, so that the front of the small dozer supplier slowly ground, then engage the clutch before continuing forward. Exit ramps are not allowed to cross the obstacles, obstacles do not pull at the drive onto the steering rod.
Through the rocky beach, the advance to choose the right path, had been opened, on the way to minimize the steering, and should low gear, small throttle driving, are not allowed in high gear, the throttle driving and sharp turns on a bumpy rocky beach.

没有评论:

发表评论